Quality Control

ˇˇ

Mold Flowchart
Part Control
Tech Blog
Products & Moulds

ˇˇ

TV & LCD Series
Vacuum Collector Series
Wash Machine Series
Air Conditioner Series
Auto & Motorcycle Series
Commodity Series
Others
Die Casting Moulds
Our "BEST"

ˇˇ

Best Solution
Endless Development
Satisfied Service
Technical Support
Home>Quality Control>Part Control

1:After T1(the First Test), We will get 10/E (10 moulding) samples,5/E of them will be sent to our customer, and 
the rest 5/E will be Controlled by our QC worker according to the Part 2D drawing through measurement tools
like follows:
2:After finishing controls, We will get the ˇ°Part Control Reportˇ±,from which we can know if the dimension is within
the normal tolenrance,and if the Part respect the 2D Part drawing.Then, We send the ˇ°Part Control Reportˇ± to 
our customer for Confirmation or to make modification on the mould.

3:The Part Control Report is the formal file for us, We normally put it with testing samples together in the 
documents in record.
ˇˇ
Copyright © 2013 Yuyao Yugao Plastic Mould Co., Ltd. All Rights Reserved
Tel:86-574-62123197 Fax:86-574-62123197 E-mail:yugao-5@yuyaoyugao.com